Experiences

Metro Line 4 Yellow in Sao Paulo
Metro Line 4 Yellow in Sao Paulo

Execution of road & site surveys + costs construction + development and execution of the door to door logistic plan with optimization of resources time and costs. Object: 01 complete Tunnel Boring Machine 9500mm diameter about 4000fton, period = 2006.

Steel Mill Projects
Steel Mill Projects
 

In Pindamonhangaba, SP + Barra Mansa, RJ, Minas Gerais and others. From 2006 to 2012. Including the execution of port operations, contract and coordination, customs clearance supervision and road transportation of heavy and oversized cargo with short schedule contract and management.

Rolling stocks
Rolling stocks
 

Coordination and execution of transportation of cranes, tractors, excavators to and from Brazil handled with necessary care 100% delivered safe and sound to final destination. Executed from 2005 to 2011.

RTG – Rubber Gantry Cranes
RTG – Rubber Gantry Cranes
 

From China to Brazilian ports: direct ocean freight negotiation, port discharge operation management. From 2005 to 2008.

Gas Pipeline Caraguatatuba-Taubaté (UTGCA)

execution of road & site surveys + pricing construction + development and execution of the door to door logistic with optimization of resources, time and costs. Object: 01 complete Tunnel Boring Machine 6500mm diameter aprox 3500fton, period = 2009.

Power Plants
Power Plants Pecem port I and II, Ceará and Itaqui I, Maranhão
 

Execution of road & site surveys + cost construction and controlling + development and execution of the door to door logistic in addition to lifting and positioning of the main items heavy lifts in their foundations, including 4 stators with 266tons each which were positioned 12 meters height. Optimization of resources, time and costs. Object: 04 complete lines of coal fired power plants aprox 200.000 ftons, from 2009 to 2012.

Metro Line 5 in Sao Paulo
Metro Line 5 in Sao Paulo

Door to door logistics for the conveyor and locomotives. Just in time delivery with optimization of resources, time and costs.

Cabiunas Project – TECAB
Cabiunas Project – TECAB

Execution of road & site surveys + costs construction + development and execution of the door to port logistic including ocean freight part chartering and port handing  and storage negotiations, ship´s stowage plan supervision – overseas - during loading of cargo. Optimization of resources, time and costs. Object: aprox 10.000fton, period = 2013.

Viracopos Airport new Passenger Terminal
Viracopos Airport new Passenger Terminal
 

Responsible for the execution of road & site surveys + cost control +

development and execution of the door to door logistic for all passenger  bridges and equipment. Optimization of resources, time and costs. Object: 28 passenger bridges and accessories  aprox 9000 ftons. January/2014.

Project UGH (Hydrogen Generation Unit) COMPERJ
Project UGH (Hydrogen Generation Unit)
COMPERJ

Responsible for the execution of road & site surveys + costs construction + development and execution of the door to port logistic including ocean freight part and full chartering negotiations. Optimization of resources, time and costs. Object: aprox 12.000fton, period = 2014.

ROCAM Motor Plant Decommissioning
ROCAM Motor Plant Decommissioning

coordination of the load + stuffing + lashing + transportation + export customs clearance, port handing and ocean freight negotiation and management of an entire engine plant.  Aprox 300 x 40´containers flat racks Out Of Gauge from Taubaté Plant, Brazil up to Bauyquan, China. Period = 2015.

Module Load out & Shipment
Module Load out & Shipment

Field coordination of load out and lifting on board at anchorage zone of an Electric Module in Batam bay, Indonesia to Brazil. Period = jan/2015.

Chinese Shipyard Projects
Chinese Shipyard Projects

Cooperation for the elaboration and execution of the transportation plan of entire modules up to 2000tons and other heavy equipment for the construction of Brazilian Oil Platforms in Chinese Shipyards. Scope of work included piece counting, packing, stuffing, preservation, load-outs, barge and truck transportation under special customs bond regime and port handling from Taubaté, Sorocaba,  Canoas, Itajaí/Brasil up to Dalian and Qingdao Shipyards/China.  Object: aprox 10.000fton, period = 2015 and 2016.

                    © 2016 of TropicosProjects.

Power Plants